Sage Modeling and Simulation Library

ISupportsPertAnalysis..::..GetOptimisticDuration Method

Optimistic duration is the minimum amount of time that executing the specific task has taken across all runs of the model since the last call to ResetDurationData();

Namespace:  Highpoint.Sage.Graphs.Analysis
Assembly:  Sage4 (in Sage4.dll)

Syntax


TimeSpan GetOptimisticDuration()

Return Value

The optimistic duration for this task.